iCFRD
  • Mobile|简体中文
  • Home
  • ICFRD
  • Immunity
  • Paper
  • Study Tour
  • Tech. Services

Paper

Books
e-Magazine
Library catalog

Chinese Edition

English Edition

CFRD WORLDWIDE

Contact Us

You Are:Home > Paper > Library catalog > Chinese Edition
Chinese Edition

Papers in Chinese Edition

  Papers listed here only for Chinese training 

1. 三峡工程二期工程混凝土研究

    Research on concrete for the 2nd Stage Works of TGP ---------------------------------- LCa 1-9

2. 三峡大坝混凝土施工配合比试验研究

    Experimental research on the construction mix proportion for concrete of Three Gorges dam -

----------------LCa 34-40

3. 三峡工程花岗岩骨料的碱活性反应实验研究

      Experiment research on alkali activity  reaction of granite aggregate for TGP--------- LCa 50-55

4. 三峡水电站厂坝间压力钢管受力特性研究

    Research on mechanical properties of penstocks between powerhouse and dam of Three Gorges Hydropower Station----- LCa 233-237 

5. 三峡库区新津镇迁建规划

   Relocation plan for Xinjin Town in the Three Gorges reservoir area--------------------- LCb 168-177

6. 三峡坝区体育馆建筑设计分析

   Analysis on building design of the gymnasium of Three Gorges Dam area-------- LCb 178-183

7. 三峡工程合同管理系统开发

  Development of contract management system for TGP ------------------------LCb 205-209

8. 信息化工程监理在国家防汛抗旱指挥系统工程建设中的作用 

      Role of information-based project supervision in the project construction of state flood control and drought relief command system -- LCc 64-76

9. 日调节水电站对区域水资源和水环境影响分析

     Analysis of impact of daily regulation hydropower stations on the regional water resources and water environment---------- -- LCc 52-53

10. 浅谈施工组织设计与投标报价

    Discussion on construction organization design and tender offer –------------------LCd90-96

11. 浅谈建立健全企业内部财务控制制度的思路和对策

    Discussion on ideas and countermeasures for establishing and perfecting the inner-financial control system for an enterprise----- -- LCe 80-82

12. 从西北口走向世界第一坝

    Construction experience from Xibeikou to Shuibuya CFRD, the highest in the world  ------

-----------------------LCfx 201-206

13. 工程款拖欠风险的防范与对策

    Prevention and countermeasure for construction payments in arrears----------------LCg49-51

14. 浅谈施工企业的质量管理与控制

  Discussion on quality management and control In construction enterprises ------- LCg42-45

15. 水利水电工程施工成本控制

Control on the construction cost for water conservancy and hydropower projects  -- LCg46-48

16.人力资源---企业真正的资本

    Manpower resource ---- real capital for a company ------------------------ LCg52-54

17. 经营管理----企业的灵魂

     Business management----- the soul of an enterprise------------------------ LCg55-58

18. 高堆石坝填筑施工质量控制

Control on the filling quality of high rockfill dams  --------------------------------LCh 75-78

19.  浅谈科研单位档案的管理

Discussion on archives management of research and development institution (R&D institution) ------------------------------LCi 94

20. 试论三峡库区农场移民外迁安置问题

On the migrant resettlement from Three Gorges reservoir area -----------------LCj1-4

21. 浅析三峡专用公路FIDIC合同条件下的索赔工作

Brief analyses of the claim for Three Gorges Accommodation Highway under the FIDIC contract conditions ------------------LCk22-24

22. 三峡工程设备监造浅议

Brief analyses of the supervision on equipment manufacturing of TGP------------ LCk16-18

23. 商务合同翻译的责任与要求

Responsibilities and requirements for the translation of business contracts   ------ LCk30-32

24. 三峡一期工程财务管理实践

Financial management practice of the first stage works of TGP------------------LCl 18-19

25. 工程项目管理要点

Key points of project management---------------------------------------------- LCl 23-24

26. 水电站建设与周边地区经济的开发

Construction of hydropower stations and economic development in their surrounding areas ------------------------------------ LCl33-372

27. 水电工程建设中减少工程投资与缩短工期的措施

     Measures to reduce engineering investment and to shorten the construction period------------------------------------------LCm213-217

28. 城市河流生态修复浅议

Brief analysis of eco-restoration along urban river course---------------- LCm226-231

29. 环境和气候变化对大坝安全的影响

Influence of environment and climate change on the dam safety---------LCn10-13

30. 思林水电站坝区岩溶水文地质特点与处理

    Karst hydrogeological characteristics and treatment at dam area of the Silin Hydropower Station -------------------------------- LCn20-23

31. 乌江中上游梯级水电站群水库优化调度方案

Optimal dispatching scheme for reservoirs of cascade hydropower stations by the middle and upper reaches of the Wujiang River - LCn56-59

32. 碾压混凝土坝施工质量控制

 Control on construction quality for the RCC dams ------------------LCn60-64

33. 具有潮流影响的电厂温排放试验研究

Test of heated discharge from power plants influenced by a tidal river---LCn75-78

34. 电力企业审计监督与服务职能的关系及未来发展趋势

Relationship between the audit supervision and service function and the future development trend in an electric power enterprise---LCn79-81

35. 预应力钢筋混凝土蜗壳的结构研究与施工

   Research and construction of structure of prestressed reinforced concrete spiral case----—LCb 13-24

36. Windows 下的中断处理方法及其在水电站仿真培训系统中的运用

   Interrupt processing method under Windows and its application of the simulation training system for hydropower stations------------LCb25-31

Hits:  UpdateTime:2015-09-13 16:48:50  【Printing】  【Close】
Previous:CFRD WORLDWIDE  Next:Xibeikou CFRD
e-Magazine |Library catalog|Teaching Materials |English Edition|ICFRD |Immunity|Paper |Study Tour|Tech. Services

iCFRD © Reserved

cheqian2468@qq.com

Skype: hydrochenqian