Papers listed here only for Chinese training
1. 三峡工程二期工程混凝土研究
Research on concrete for the 2nd Stage Works of TGP ---------------------------------- LCa 1-9
2. 三峡大坝混凝土施工配合比试验研究
Experimental research on the construction mix proportion for concrete of Three Gorges dam -
----------------LCa 34-40
3. 三峡工程花岗岩骨料的碱活性反应实验研究
Experiment research on alkali activity reaction of granite aggregate for TGP--------- LCa 50-55
4. 三峡水电站厂坝间压力钢管受力特性研究
Research on mechanical properties of penstocks between powerhouse and dam of Three Gorges Hydropower Station----- LCa 233-237
5. 三峡库区新津镇迁建规划
Relocation plan for Xinjin Town in the Three Gorges reservoir area--------------------- LCb 168-177
6. 三峡坝区体育馆建筑设计分析
Analysis on building design of the gymnasium of Three Gorges Dam area-------- LCb 178-183
7. 三峡工程合同管理系统开发
Development of contract management system for TGP ------------------------LCb 205-209
8. 信息化工程监理在国家防汛抗旱指挥系统工程建设中的作用
Role of information-based project supervision in the project construction of state flood control and drought relief command system -- LCc 64-76
9. 日调节水电站对区域水资源和水环境影响分析
Analysis of impact of daily regulation hydropower stations on the regional water resources and water environment---------- -- LCc 52-53
10. 浅谈施工组织设计与投标报价
Discussion on construction organization design and tender offer –------------------LCd90-96
11. 浅谈建立健全企业内部财务控制制度的思路和对策
Discussion on ideas and countermeasures for establishing and perfecting the inner-financial control system for an enterprise----- -- LCe 80-82
12. 从西北口走向世界第一坝
Construction experience from Xibeikou to Shuibuya CFRD, the highest in the world ------
-----------------------LCfx 201-206
13. 工程款拖欠风险的防范与对策
Prevention and countermeasure for construction payments in arrears----------------LCg49-51
14. 浅谈施工企业的质量管理与控制
Discussion on quality management and control In construction enterprises ------- LCg42-45
15. 水利水电工程施工成本控制
Control on the construction cost for water conservancy and hydropower projects -- LCg46-48
16.人力资源---企业真正的资本
Manpower resource ---- real capital for a company ------------------------ LCg52-54
17. 经营管理----企业的灵魂
Business management----- the soul of an enterprise------------------------ LCg55-58
18. 高堆石坝填筑施工质量控制
Control on the filling quality of high rockfill dams --------------------------------LCh 75-78
19. 浅谈科研单位档案的管理
Discussion on archives management of research and development institution (R&D institution) ------------------------------LCi 94
20. 试论三峡库区农场移民外迁安置问题
On the migrant resettlement from Three Gorges reservoir area -----------------LCj1-4
21. 浅析三峡专用公路FIDIC合同条件下的索赔工作
Brief analyses of the claim for Three Gorges Accommodation Highway under the FIDIC contract conditions ------------------LCk22-24
22. 三峡工程设备监造浅议
Brief analyses of the supervision on equipment manufacturing of TGP------------ LCk16-18
23. 商务合同翻译的责任与要求
Responsibilities and requirements for the translation of business contracts ------ LCk30-32
24. 三峡一期工程财务管理实践
Financial management practice of the first stage works of TGP------------------LCl 18-19
25. 工程项目管理要点
Key points of project management---------------------------------------------- LCl 23-24
26. 水电站建设与周边地区经济的开发
Construction of hydropower stations and economic development in their surrounding areas ------------------------------------ LCl33-372
27. 水电工程建设中减少工程投资与缩短工期的措施
Measures to reduce engineering investment and to shorten the construction period------------------------------------------LCm213-217
28. 城市河流生态修复浅议
Brief analysis of eco-restoration along urban river course---------------- LCm226-231
29. 环境和气候变化对大坝安全的影响
Influence of environment and climate change on the dam safety---------LCn10-13
30. 思林水电站坝区岩溶水文地质特点与处理
Karst hydrogeological characteristics and treatment at dam area of the Silin Hydropower Station -------------------------------- LCn20-23
31. 乌江中上游梯级水电站群水库优化调度方案
Optimal dispatching scheme for reservoirs of cascade hydropower stations by the middle and upper reaches of the Wujiang River - LCn56-59
32. 碾压混凝土坝施工质量控制
Control on construction quality for the RCC dams ------------------LCn60-64
33. 具有潮流影响的电厂温排放试验研究
Test of heated discharge from power plants influenced by a tidal river---LCn75-78
34. 电力企业审计监督与服务职能的关系及未来发展趋势
Relationship between the audit supervision and service function and the future development trend in an electric power enterprise---LCn79-81
35. 预应力钢筋混凝土蜗壳的结构研究与施工
Research and construction of structure of prestressed reinforced concrete spiral case----—LCb 13-24
36. Windows 下的中断处理方法及其在水电站仿真培训系统中的运用
Interrupt processing method under Windows and its application of the simulation training system for hydropower stations------------LCb25-31